My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 1986 - 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 2:53:11 PM
Creation date
5/15/2019 2:02:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1997
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Herding Lawson Associates <br /> June 17, 1988 <br /> 4167,218.02 <br /> Mr. James M. Kerr, Jr. , P.G. <br /> Exxon Company, USA <br /> Page 3 <br /> - Develop and sample the monitoring wells <br /> - Prepare report <br /> Estimated cost: $10,000 to $20,000 <br /> Phase II <br /> If review of data indicates that a release of contaminants from a tank or <br /> line leak, spillage, or other source has occurred: <br /> - Determine lateral and vertical extent of contamination <br /> - Evaluate impact of contamination on soil and ground-water quality <br /> - Evaluate remediation measures if warranted <br /> - Prepare report <br /> Estimated cost $50,000 to $100,000 <br /> Phase III <br /> If after the completion of Phase II it is warranted to implement remedial <br /> measures to comply with state and local regulations, the following options <br /> are available: <br /> - Soil removal and disposal or treatment by aeration <br /> - In situ air venting <br /> - In situ bioremediation <br /> - Ground-water extraction with treatment by carbon filtration, air <br /> stripping or bioremediation <br /> Estimated cost: $200,000 to $900,000 <br /> Depending on site conditions, investigation costs could be as little as <br /> $10,000. However, if all three phases of work are required, the total <br /> estimated cost could range between $250,000 and $1,000,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.