My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998 - 2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 1998 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 2:48:23 PM
Creation date
5/15/2019 2:04:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2000
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- W. A. CRAIG, INC. <br /> Environmental Consulting and Contracting <br /> 6940 Tremont <br /> Dixon, California 95620 <br /> Contractor and Hazardous Substances License #455752 <br /> Cal/OS14A Statewide Annual Excavation Permit 98-900447 <br /> (800) 522-7244 <br /> Phone: (707)-693-2929 Dixon Napa (707)-252-3353 <br /> Fax: (707)-693-2922 <br /> November 19, 1999 <br /> Mr. Michael Kith <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 E. Weber St., Third Floor <br /> Stockton, CA. 95202 <br /> 209-468-3420 <br /> Fax-468-3433 <br /> Regarding: Application to Reopen the Gasoline Station Located at 6425 Pacific Ave., Stockton <br /> Dear Mr. Kith: <br /> I appreciated the opportunity to speak with you by phone on the seventeenth regarding the above <br /> referenced site. As we discussed, the new operators have retained W. A. Craig, Inc., to perform the <br /> necessary work to upgrade the station so that it can be reopened. <br /> Asa part of our work,we are in the process of completing a set of plans to submit to you for review. These <br /> plans will detail the work which needs to be performed to complete the necessary upgrades. Prior to <br /> submitting the plans,it would be appreciated if a consultation site visit could be arranged so that we are <br /> fully informed of the changes which the County would like to see at the station and consequently reflect <br /> these changes in the plans that we will be submitting. <br /> Please notify us of the earliest possible date when this site visit could be performed as new operators of <br /> the site are interested in moving forward as quickly as possible. Also please consider this a formal <br /> request to renew the operating permit for the site. <br /> If there are any question please contact me at the numbers noted above. Thank you for your assistance <br /> with this. <br /> Si <br /> Leland Yialelit <br /> General Manager <br /> cc: Mason Center LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.