Laserfiche WebLink
RE <br />RPR -27-2006 07:10 <br />Service Station Systems <br />408 938 8888 P.07 <br />Monitoring System Certification <br />UST Monitoring Site Plan <br />6425 N. Pacific Ave. @ Central Ct. in Stockton <br />4/10/06 <br />Date map was drawn: _Z/ <br />Instructions <br />On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if <br />installed: monitoring system control panels; sensors monitoring tank annular spaces; sumps, dispenser pans, spill <br />containers, or other secondary containment areas; mechanical or electronic line leak detedtors; and in -tank liquid <br />level probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />TOTRL P.07 <br />