My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2004 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 3:05:27 PM
Creation date
5/15/2019 2:09:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2008
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP-25-2008 12:55 Service Station Systems 408 938 8888 P.04 <br /> 4. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Incon Sump Tester Equipment Resolution: +/•0.002" <br /> Inman <br /> STP Sump N 87 <br /> Sump Diameter: 49" <br /> Sump Depth: 84" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of <br /> Hi hest Pi in Penetration: y, <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 43" <br /> Condition of sump prior to testing: Good <br /> Portion of Sump Tested' 2"above piping <br /> Does turbine shut down when <br /> sump sensor detects liquid (both ❑Yes❑No ®NA <br /> product and water)?' <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe ❑Yes❑No ®NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑Yes ❑No ®NA <br /> operational?' <br /> Wait time between applying <br /> pfessure/vacuum/water and starting 30 minutes <br /> test: <br /> Test Start Time: 2:31 pm <br /> Initial Reading(RD: 3.2817 <br /> Test End Time: 2:46 pm <br /> Final Reading(RP): 3.2829 <br /> Test Duration: 15 min. <br /> Change in Reading(RP-RD: +0.0012 <br /> Pass/Fad Threshold or Criteria: +/-0.002" <br /> Test Result: ® Pass Fail <br /> Was sensor removed for testing? ®Yes❑No [INA <br /> Was sensor properly replaced and ®Yes ❑No❑NA <br /> verged functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed rests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> Replaced tom piping penetration and electrical conduit boots <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (Sce SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.