Laserfiche WebLink
SEP-25-2008 12:56 Service Station Systems 408 938 8888 P.06 <br /> 6. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spillloverfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: El Spill Bucket Manufacturer ® industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> Fill Spill Box#91 Vapor Spill Box#87 j <br /> Bucket Diameter: 12" 11" <br /> Bucket Depth: 10" 14" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min. to min. <br /> starting test: <br /> Test Start Time: 1:42 pm 1:42 pm <br /> Initial Reading(RO: 5.2159 4.0828 <br /> Test End Time: 1:57 pm 1:57 pm <br /> Final Reading(RF): 5.2160 4.0832 <br /> Test Duration: 15 min. 15 min. <br /> Change in Reading(RF-Rt): +0.0001 +0.0004 <br /> PasvFail Threshold or +/-0.002" <br /> Criteria: <br /> Test Result: 1 0 Pass Fail O Pass Fail <br /> COlt MentS—(include information on repairs made prior to testing,and recommemdedfollow-up forfailed tests) <br /> Replaced dust caps <br /> TOTRL P.06 <br />