My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES= NO r,7 <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> addinc piping, UDC's, or other UST equipment, or performing tank lop upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> sump lids check and adjusted so as to sit flat on sump top <br /> clamp replaced <br /> pea gravel level adjusted, if necessary <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> CNI cam lock/clamp <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.