My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR-23-2010 09:55 Service Station Systems 409 938 eeee P.09i11 <br /> 9. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> UDC#1/2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer Western Fiberglass Western Fiberglass Western Fiberglass western Fiberglass <br /> UDC Material: Fiber lass Fiber"lass Fiberglass Fiberglass <br /> UDC Depth: 31" 31" 31" 31" <br /> Height from UDC Bottom to Top 12" 12" 12" 12" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 4" 4" 4" 4" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Good Good Good Good <br /> testing: <br /> Portion of UDC Tested 2"above piping 2"above piping 2"above piping 2"above piping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes 171 No 0 NA ❑Yes E3 No UNA [3 Yes C]No UNA ❑Yes❑No 0 NA <br /> productand <br /> water ? <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail- ©Yes❑No 0 NA ❑Yes❑No IONA ❑Yes❑No ®NA ❑Yes❑No ❑NA <br /> safe shutdown? <br /> Was fail-safe verified to be ❑Yes Ll No 0 NA ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No R NA <br /> operational? <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> Startinz test <br /> Test Start Time: 12:50 pm 12:27 pin 12:27 pm 11:17 am <br /> Initial Readin Rt : 3.6558 3.7271 3.1520 4.7295 <br /> Test End Time: 1:05 pm 12:42 pm 12:42 am 11:32 am <br /> Final Reading(RF): 3.6558 3.7267 3.1510 4.7296 <br /> Test Duration: 15 min. 15 min. 15 min. 15 min. <br /> Change in Reading(RF-Rl : None -0.0004 -0.0010 +0.0001 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: 191 Pass d Fail M Pass ❑Fail El Pass ❑Fail 0 Pass ❑Fail <br /> Was sensor removed for testin . M Yes❑No❑NA0 Yes❑No [INA I 0 Yes❑No❑NA I 29Yes❑No ❑NA <br /> Was sensor properly replaced and 0 yes Q No❑NA 0 Yes 0 No ❑NA 0 Yes❑No❑NA 0 Yes[3No E]NA <br /> verified functional after testing? <br /> Comments—(include in ormation on repairs madeprior to testin , and recommended ollaw-u for failed rerRv) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO" or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.