Laserfiche WebLink
Page 1 of 1 <br /> Garrett Backus [EH] <br /> From: Garrett Backus [EH] <br /> Sent: Friday, January 29, 2010 11:50 AM <br /> To: 'Debbie Watts' <br /> Cc: Butch Hobson (butch.hobson@safeway.com) <br /> Subject: Safeway-6425 Pacific Ave Stockton Six Month test <br /> Hi Debbie, <br /> Just wanted to mention that the secondary containment repairs done on Aug 6 and Aug 10 2009 need a followup <br /> six month secondary containment test done(Title 23 CCR 2637). A portion of the diesel line was replaced and <br /> penetration fittings were installed in UDC 1/2 and 3/4. Secondary containment testing is required on Feb 10, <br /> 2010 on these components. Send 48 hour notification to my office. <br /> Safeway may want to do the complete, three year, secondary containment testing on the system since it is due in <br /> November of this year. <br /> Garrett Backus, REHS <br /> San Joaquin County Environmental Health Department <br /> 600 E. Main Street <br /> Stockton, CA 95202 <br /> telephone: (209) 468-2986 <br /> fax: (209) 468-3433 <br /> email: gbackus@sjcehd.com <br /> 1/29/2010 <br />