My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4kON1 & CON2, SPR <br />MANUFACTURING� � ,-.. <br />- CONTAINER ASSE=MBLIES <br />FOR 2 POINT SYSTEMS <br />SPECIFICATIONS: <br />*BELLOWS: ,ERUNA N, RUBBER. <br />*BELLOWS. COMPRESSION RING; DUCTILE IRON, <br />-SPILL CONTAINER: BLACKCROSS-LINK <br />POLYETHYLENE. <br />*DRAIN VALVEASS'Y.: 356T6F(ARDCOAT <br />+ ANODIZED ALUMINUM. <br />FLANGE COMPRESSION WHO: DUCTILE IRON. <br />*OVAL DRAIN FLANGE DUCTILE IRON. <br />*ROUND FLANGE: DUCTILE IRON. <br />P/N QN2. <br />MPRP-14 <br />Butt} N, rubber <br />STP -42 <br />5 gallon containment <br />with oval cutout <br />)w density polyethylene <br />RP12-PUSH <br />Drain Value Assembly <br />STP -22, OV91 JI -0 <br />Drain Flange <br />Product <br />FEAMIRX& <br />*THE SPILL CONTAINERS ARE PRE -ASSEMBLED AT THE <br />FACTORY FOR EASE OF INSTALLATION. <br />*MAKES FOR A CONTRACTOR FRIENDLY INSTALLATION. <br />* ONCE THE TANK RISER 1S MEASURED AND INSTALLED <br />THE DROP TUBE GOES IN PLACE. REMOVE THE <br />CONTAINMENT FROM THE BOX, PUT 1T ON THE RISER, <br />SCREW IT ON AND TORQUE IT TO 195-200 FOOT LBS. <br />STPr13 <br />4 pc. Bellows <br />Reinforcement Plates <br />13ESCRIPTIO. P RT;# <br />OOKTAIK1MENT It�$TALLAAncK Rr=M0VAL TOOL EVRSYS716 <br />MAGE OF Ouc'nLE 9;CON' <br />STP -17, Oval Flange <br />Compression Ring <br />MPRP-10 <br />Bellows <br />Buna N. Rubber <br />STP -43 <br />5 Salton containment <br />rAKround cutout <br />Low iiensisy polyethylene <br />STP -24, Round <br />Drain Flange <br />P/N crawl <br />vapor <br />THIS UNIT IS TOTALLY PRE -ASSEMBLED AT THE <br />FACTORY FOR EASE OF INSTALLATION. <br />(AS SHOWN IN THE CROSS-SECTION ABOVE) <br />STP -13 <br />4 po. Bellows <br />Reinforcement Plates <br />STP -18, Round Flange <br />Compression Ring <br />
The URL can be used to link to this page
Your browser does not support the video tag.