My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT I'- cOR MORE INFORMATION! <br />2YR 5555 Skylane Blvd., Su A / Santa Rosa, CA 9543 <br />bass Ph: (800) 688-3375 / Fx: (800) 700-1188 <br />www.westernfg.com <br />Pressure System Supply Piping <br />Suction System Supply Piping <br />Tank Vent Piping <br />Stage II Vapor Recovery Piping <br />Remote Fill Lines <br />Terminations: All piping terminations are to be within contained, <br />accessible, sump areas to facilitate testing and inspection after <br />installation. <br />Operatina Pressures 8, Vacuums: Operating pressure should not exceed 75 <br />psi or a vacuum of 29" Mercury. <br />Operating Temperatures: Operating temperatures should not exceed 150 <br />degrees F or 66 degrees C. <br />Bend Radius: The listed bend radius should be followed to prevent <br />cracking, kinking or breaking. Any kinked sections should not be used. <br />Pipe Diameter <br />ID Minimum Bend Radius <br />3" <br />72" <br />2" <br />36" <br />1 1/2, <br />24" <br />1 „ <br />18" <br />3/4" <br />18" <br />On site air temperature does affect the flexibility during installation, the <br />piping is more pliable when warm. <br />Testing: Primary piping for 3", 2", 1 '/2", 1" and %" shall be capable of <br />maintaining 50 psi for a minimum of one (1) hour. Secondary interstitial <br />space for 3", 2", 1 '/2", 1 ", %" shall be capable of maintaining 10 psi for a <br />minimum of one (1) hour. These tests may be performed after installation is <br />complete, but before backfill. Allowed monitoring methods are by <br />Pressure, Vacuum or Interstitial Liquid Level Monitoring (ILLM). Please note: <br />the interstitial space of Co -Flex Piping has a capacity of approx. one (1) <br />fluid ounce per linear foot. Care needs to be taken when pressurizing the <br />secondary, add pressure slowly and do not exceed 10 psi during <br />pressurization process. Always use safe procedures when pressure testing <br />piping systems. Western Fiberglass, Inc. assumes no liability or responsibility <br />for testing procedures. <br />Page 4 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.