My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/�����+ ' <br />CONTACT I'- "OR MORE INFORMATION! <br />5555 Skylane Blvd., Su. A / Santa Rosa, CA 95403 <br />Ph: (800) 688-3375 / Fx: (800) 700-1188 <br />www.westemfg.com <br />Prepare coupling fitting and attach Co -Flex termination fitting (male or <br />female) to connector within sump area/s. Tighten. <br />Position pipe within trench. Lay out piping runs while maintaining <br />separation between pipe lengths and at crossover points. <br />TEST & CROSSOVER BOOT/TUBING INSTALLATION: <br />The Test/Crossover Assembly Boots are attached to the Co -Flex Piping <br />ends to provide a sealed access and test point for the <br />interstitial/secondary space within the pipe. The Test/Crossover Boots <br />utilizes two (2) #28 stainless steel hose clamps which when tightened <br />around the termination fitting swage sleeve and the Co -Flex outer jacket <br />isolate the interstitial space. An air valve stem is installed in the boot on <br />the bottom for an outlet opening for connecting the crossover and/or test <br />tubes. These tubes are used for the testing of and the interconnection of <br />the interstitial space from pipe section to pipe section. Crossover tube <br />assemblies are used for junctions within dispenser sumps, pipe to pipe in <br />line connections, piping run termination points, tank sump connection <br />points and any piping manifold connection points. <br />Test/Crossover Boots and tubes are fitted and tightened in place after the <br />piping terminations and their connections have been made. <br />After installation and tightening of all test and crossover boots and tubes <br />pressure testing may be done. (See Above). <br />Page 12 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.