My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT 1` rOR MORE INFORMATION! <br />tern 5555 Skylane Blvd., SL A / Santa Rosa, CA 95463 <br />rglBis Ph: (800) 688-3375 / Fx: (800) 700-1188 <br />www.westemfg.com <br />Vapor/Vent Containment Sump <br />INSTALLATION INSTRUCTIONS <br />Please read this manual completely prior to installation. These instructions <br />do not supersede local laws and regulations. Always comply with local <br />requirements. <br />1). Inspect Containment Box upon receipt for any shipment damage. <br />2). Locate and install piping, conduit and service penetration fittings as <br />needed. Follow penetration manufacturer's instructions as required. <br />3). Set box to grade, level and ensure that all anchor tabs, frame locks <br />and the perimeter frame are in the correct position(s) to be covered with <br />concrete during pour as required. Use'/4" to 1/2" clean "pea gravel" under <br />and around box. Compress backfill below and around Vent Box for <br />proper support. <br />4). Install piping, maintaining proper fall/entry angles. Test piping and <br />penetrations as instructed by local and regional regulations and <br />manufacturers instructions. <br />5). After concrete has cured, install rack and stand pipe assemblies. Slip <br />bottom section of rack(s) into receivers of the perimeter framework and <br />secure using 1/2" bolts. Repeat procedure for the top sections installing <br />into lower sections. <br />6). Secure vent risers/stand pipes to rack assembly. Tighten stand pipe <br />entry compression fittings at top of containment box, one per riser pipe. <br />Use care not to over tighten. See manufacturer's instructions. Replace <br />containment box lid. Use care not to damage gasket and that there are <br />no foreign objects or dirt/sand between lid and gasket material. <br />Tighten/torque lid bolts to approximately 10-12 foot pounds. <br />Page 38 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.