My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-09-2009 15:33 Service Station Systems <br />4. SECONDARY PIPE TESTING <br />Test Method Developed By: [] Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: M Pressure ❑ Vacuum ❑ Hydrostatic <br />[] Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges <br />Piping Run # 87 Piping Run # 91 <br />Equipment Resolution: 0.5% of span <br />Piping Material: <br />Plastic <br />Plastic <br />Piping Manufacturer <br />Western fiberglass <br />Western fiberglass <br />Piping Diameter: <br />1.5" <br />1.5' <br />Length of Piping Run: <br />Product Stored: <br />Gasoline <br />Gasoline <br />Method and location of <br />piping -run isolation: <br />Reducer 13mhOttinp <br />Reducer NaNx/Fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />Test Start Time: <br />1.15 pm <br />1:15 pm <br />Initial Reading (Rt): <br />5 psi <br />5 psi <br />Test End Time: <br />2:15 pm <br />2:15 pm <br />Final Reading (RP): <br />5 psi <br />5 psi <br />Test Duration: <br />I hr. <br />1 hr. <br />Change in Reading (RP -Rt): <br />none <br />none <br />PasVFail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />Test Result: <br />® Pass Fail <br />O Pass Fail <br />Co1RItlentS - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.