Laserfiche WebLink
JUL-09-2009 15:33 Service Station Systems <br />4. SECONDARY PIPE TESTING <br />Test Method Developed By: [] Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: M Pressure ❑ Vacuum ❑ Hydrostatic <br />[] Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges <br />Piping Run # 87 Piping Run # 91 <br />Equipment Resolution: 0.5% of span <br />Piping Material: <br />Plastic <br />Plastic <br />Piping Manufacturer <br />Western fiberglass <br />Western fiberglass <br />Piping Diameter: <br />1.5" <br />1.5' <br />Length of Piping Run: <br />Product Stored: <br />Gasoline <br />Gasoline <br />Method and location of <br />piping -run isolation: <br />Reducer 13mhOttinp <br />Reducer NaNx/Fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />Test Start Time: <br />1.15 pm <br />1:15 pm <br />Initial Reading (Rt): <br />5 psi <br />5 psi <br />Test End Time: <br />2:15 pm <br />2:15 pm <br />Final Reading (RP): <br />5 psi <br />5 psi <br />Test Duration: <br />I hr. <br />1 hr. <br />Change in Reading (RP -Rt): <br />none <br />none <br />PasVFail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />Test Result: <br />® Pass Fail <br />O Pass Fail <br />Co1RItlentS - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />