My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS PR0544462
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
3500 - Local Oversight Program
>
PR0544462
>
ARCHIVED REPORTS PR0544462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:00 AM
Creation date
5/16/2019 8:34:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
PR0544462
RECORD_ID
PR0544462
PE
3528
FACILITY_ID
FA0003551
FACILITY_NAME
B J J COMPANY INC
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. FIELD PROCEDURES <br /> ale—Safety PI n <br /> This plan describes the safety requirements for field work performed at the site. The site <br /> safety plan is applicable to personnel of Canonie/Smith Environmental Technologies <br /> Corporation (SMTH) who perform the field work A copy of the site safety plan is available <br /> for reference by appropriate parties during the work. The onsite representative of SMTH acts <br /> as the Site Safety Officer. <br /> Drilling Methods <br /> Before drilling begins, SMTH notifies Underground Service Alert so that approximate <br /> locations of underground utility lines and structures can be marked. The soil borings are <br /> started by hand-angenng or probing to a depth of 3 to 5 feet to minimize the possibility of <br /> damaging underground utilities <br /> Borings are drilled with a CME 55 or similar drill ng equipped with continuous-flight, hollow- <br /> stem augers. The augers are steam-cleaned before use in each boring to minimize cross- <br /> contamination of the borings. The drill cuttings are stored in Department of Transportation <br /> (DOT) 55-gallon drums or stockpiled onsite and covered with plastic pending disposal at an <br /> appropriate disposal facility <br /> Soil Sampling in Borings <br /> Soil samples for analysis and identification are collected at approximately 5-foot intervals from <br /> the borings during drilling. Soil samples are collected by advancing the boring to a point just <br /> above the sampling depth and then driving a California-modified, split-spoon sampler <br /> containing clean brass sleeves through the hollow center of the auger into the soil The <br /> sampler is driven 18 inches with a standard 140-pound hammer repeatedly dropped 30 inches. <br /> The number of blows needed to drive the sampler each successive 6 inches is counted and <br /> recorded to evaluate the relative consistency of the soil Sampling equipment is cleaned <br /> between each use with an industrial non-phosphate soap and clean tap water. <br /> Soil Sample belin nd Handling <br /> The soil samples selected for possible laboratory analysis are removed from the sampler and <br /> quickly sealed in their brass sleeves with Teflon tape and plastic caps. The respective sample <br /> containers are labeled in the field with the fob number, sample location and depth, and date, <br /> and promptly placed in iced storage for transport to the laboratory. Chain of Custody Records <br /> are initiated in the field by the technician and accompany the samples to a laboratory certified <br /> by the State of California to perform the requested analyses. <br /> SHF-LLSIFLDMTHDS doe 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.