Laserfiche WebLink
Smith Environmental SITE SAFETY PLAN <br /> On-site communications: 0 Radio ®Verbal 0 Hand Signals <br /> I] Other <br /> Designate hand signals here: <br /> Off-site communications: l] Radio ® Telephone <br /> 0 Other <br /> The specific signal for an emergency is- Verbally Given <br /> The specific signal for an evacuation is. Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beainninq_work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP L7 CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal _protective equipment <br /> (i e., gloves, coveralls) will be placed on and <br /> covered with 6-mil plastic sheeting along with the <br /> drill cuttings. <br /> Location of Wash Water: Restroom on-site <br /> Location of Toilet: Restroom on-site <br /> Location of Drinking Water: Smith Environmental truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP 0 CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure. Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned <br /> Materials to be Disposed of as Hazardous Waste* All soil and water produced will be stored <br /> on-site until appropriate disposal methods <br /> are determined. <br /> PAGE <br />