My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010091
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
3500 - Local Oversight Program
>
PR0544462
>
ARCHIVED REPORTS XR0010091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:04 AM
Creation date
5/16/2019 8:39:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010091
RECORD_ID
PR0544462
PE
3528
FACILITY_ID
FA0003551
FACILITY_NAME
B J J COMPANY INC
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 Sampling and Drilling Equipment Decontamination <br /> All equipment used for drilling, well materials and sampling <br /> soil and groundwater will be decontaminated prior to use. <br /> All equipment used for collection of more than one sample, <br /> � . such as bailers and spoons, will be decontaminated between <br /> each use to prevent cross contamination between samples. <br /> Drilling equipment will be decontaminated prior to <br /> commencing drilling at each hole. <br /> Equipment and well material decontamination will be <br /> conducted on an impermeable surface and all decontam'Laation <br /> z effluent will be contained. All surfaces of the Equipment <br /> will be thoroughly rinsed with potable water. The equipment <br /> will be placed on a drying rack for air drying. The <br /> decontamination water will stored in containers certified <br /> for hazardous materials storage and disposed of in an <br /> approved manner. <br /> Sample equipment to be used for pe-ticides and organic <br /> analysis will be washed in a nonphosphate detergent (Alconox <br /> or equivalent) and rinsed with tap water, followed by <br /> deionized water and finally with acetone. If the equipment , <br /> is for metals analysis, the initial rinse will be conducted j <br /> with 0.1 N nitric acid followed by tap water and deionized <br /> a water. <br /> 7.0 Field Equipment Calibration and Maintenance <br /> The following measuring equipment may be used during the <br /> { Remedial Investigation. Equipment is grouped by field <br /> activity. Calibration procedures and frequency are listed <br /> fcr each piece. <br /> Soil Borings and Well Installation- Steel and coated cloth <br /> tape. Calibration: none. <br /> Water Level Measurements in Wells- Stael surveyors tape. <br /> Calibration: manufacturer supplied temperature correction <br /> will be applied as applicable for field conditions. <br /> Electrical well sounders. Calibration: check against steel <br /> surveyor's tape. <br /> Organic Vapors- Photoionization detector. Calibration: <br /> j Daily field Calibration using a benzene standard. <br /> Groundwater 2H Measurement- Digital pH meter. Calibration: <br /> standard pH solutions of 4, 7, and la will be utilized for <br /> daily field calibration. <br /> 3 <br /> 3 <br /> x <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.