My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010091
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
3500 - Local Oversight Program
>
PR0544462
>
ARCHIVED REPORTS XR0010091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:04 AM
Creation date
5/16/2019 8:39:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010091
RECORD_ID
PR0544462
PE
3528
FACILITY_ID
FA0003551
FACILITY_NAME
B J J COMPANY INC
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V ftw <br /> Soil Sampling Protocol <br /> 1. Sample Coll__6.,on During Drilling Activities <br /> A proposal will be submitted to the lead Regulatory Authority <br /> with proposed boring/sampling locations. The exact location <br /> and number of borings at each site will be determined in the <br /> field by the Project Geologist/Engineer. <br /> Prior to arriving at the sample site, the drill rig/augers <br /> �« will be steam cleaned and all sample equipment will be <br /> cleaned. Cleaning will be conducted on-site ori all sampling <br /> " equipment between each sample interval. <br /> Soil samples will be obtained using a California modified , <br /> split-spoon sampler containing 'three, six inch long, two inch <br /> diameter brass tubes. The sampler will be driven 18 inches <br /> ahead of the hollow stem ?;Ager by a 140 pound hammer with a <br /> 30 inch drop in accordance with American Society for Testing <br /> and Materials (ASTM) Methods D 1586-84 for split barrel <br /> �., sampling of soil and D 1587-83 for thin-wailed tube sampling <br /> of soils. The blows required to drive the sampler each six <br /> inch interval will be recorded on the boring log. The <br /> i sampler will be removed from the boring and opened to reveal <br /> "- the brass tubes. The bottom tube will be capped with <br /> aluminum foil and plastic end caps, taped and labeled with <br /> the following information: date, time, project ID, sample <br /> ID, name of sampler and type of analysis. This sample will <br /> be immediately placed laced into a cooler containing dry ice or <br /> frozen "blue ice" . A "high-low" temperature recording <br /> thermometer will accompany sample shipments to ensure proper <br /> temperature maintenance. The samples will be delivered to a <br /> state certified laboratory under chain-of-custody protocol <br /> within 48 hours of sampling, when ever possible. <br /> Soil in the uppermost brass tube will be described according <br /> to ASTM standard practice for description and identification <br /> of soils (ASTM D-2488-84) . Stratigraphic, genetic and other <br /> data/interpretations will also be recorded. Soil properties <br /> also be noted in the middle brass tube and from the sampler <br /> shoe. Alternatively the second sample tube may be used with <br /> the uppermost tube for preparation of duplicates. These <br /> field observations will be noted on a log prepared for each <br /> boring/well. <br /> During sampling, latex gloves will be worn to prevent cross- <br /> contamination with other samples. The disposable gloves will <br /> be discarded after collecting samples from each 18-inch <br /> sam-j:.le drive. <br /> I <br /> a <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.