My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
3500 - Local Oversight Program
>
PR0544463
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:50 AM
Creation date
5/16/2019 8:42:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544463
PE
3528
FACILITY_ID
FA0003214
FACILITY_NAME
EASTGATE BUSINESS PARK*
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Messrs Trommer and Lan 36 June 2008 <br /> Preliminary Five-Year Review Letters Page 7 of 7 <br /> Various Sites <br /> 11530 Eight Mile Road, W. <br /> • The CUF recommended directing assessment and implementation of active <br /> remediation; the EHD agrees with the intent of the recommendation, but believes <br /> that that directive should be withheld until a pending report of findings from a <br /> recently complete deep delineation investigation and a pending SCM has been <br /> received and reviewed by the EHD. <br /> 14749 Thornton Road, N. <br /> • The CUF recommended evaluation of the sampling frequency and <br /> implementation of SVEIIAS. The EHD agrees with the recommendation; a RAP <br /> has been approved, the needed wells have been installed and the remediation <br /> system is under construction. <br /> 15615 7"' Street, S. <br /> • The CUF recommended implementation of active remediation without delay; the <br /> EHD agrees with this recommendation. A favorable pumping test has been <br /> completed and reported, DPE has been approved for the site, the system has <br /> been installed and permits to operate are pending from the City and SJVUAPCD. <br /> 23569 Santa Fe Road, S. <br /> • The CUF recommended termination of SVE and monitoring groundwater for one <br /> hydrological cycle. The EHD agrees with the recommendation; a work plan to <br /> install fourteen MIP borings on and off site has been approved. <br /> 800 Main Street, E. <br /> • The CUF agreed with the EHD on the approved remedial work plan. <br /> Questions or comments should be directed to the appropriate caseworker. <br /> Sincerely, <br /> Harlin Knoll, REHS Michael In rna, REHS <br /> Senior Registered Environmental Senior Registered Environmental <br /> Health Specialist Health Specialist <br /> r <br /> Nuel Henderson, PG Margaret LaVorio, REHS <br /> Engineering Geologist Program Coordinator <br /> 5-Year Review Comment Letter 061608.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.