My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010118
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
3500 - Local Oversight Program
>
PR0544463
>
ARCHIVED REPORTS XR0010118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:05 AM
Creation date
5/16/2019 8:47:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010118
RECORD_ID
PR0544463
PE
3528
FACILITY_ID
FA0003214
FACILITY_NAME
EASTGATE BUSINESS PARK*
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 30 SUMMARY OF PREVIOUS ACTIVITIES AT FORMER TANK SITE 2 <br /> The following activities were completed at former tank site 2 These were <br />' conducted concurrently with activities described above for former tank <br /> site 1 <br />' + Removal of a 2,000-gallon UST (February 1998), <br /> • Excavation of petroleum hydrocarbon-impacted soil and extraction of <br /> petroleum hydrocarbon-impacted ground water from the tank <br /> excavation (February to March 1998), <br /> • Installation of nine soil borings, five ground water HydroPunches, and <br />' a monitoring well (April 1998), <br /> • Installation of two additional monitoring wells (November 1998), <br />' • Installation of one additional soil boring and ground water <br /> HydroPunch (February 1999), <br />' • Ground water remediation (June 1999), and <br /> • Routine ground water monitoring during the period from May 1998 <br /> through February 2000 <br /> A description of each of these activities is provided in the following <br /> subsections Figure 9 illustrates site features, soil and ground water <br /> sampling locations, and monitoring well locations at former tank site 2 <br />' Table b presents all soil sampling data generated during investigations at <br /> former tank site 2 Tables 7 and 8 present all ground water sampling data <br /> at former tank site 2 generated from HydroPunches and morutoring wells, <br /> trespectively <br />' 31 TANK REMOVAL <br />' A summary of the tank removal activities is presented in the Tank <br /> Removal Report Accordingly, the tank removal activities are only briefly <br /> summarized below <br /> Under the supervision of CTFD and PHS/EHD representatives, the 2,000- <br /> gallon UST was removed on 18 February 1998 ERM EnviroClean of <br />' Walnut Creek, California, was retained to remove the UST Erickson, Inc , <br /> of Richmond, California, was responsible for the transport and disposal of <br />' the UST, tank contents, and tank rinsate The top of the tank was severely <br />' ERM 11 HEINZ USA-3374 60-3/27/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.