Laserfiche WebLink
m� <br /> o� <br /> O <br /> O <br /> H8-3 <br /> (<0 5) <br /> n r) H8-5 <br /> 1 • <br /> (<0 5) <br /> T C <br /> (A 0 <br /> O or <br /> I <br /> � Ha_4.p <br /> uy <br /> r PROPANE ASTs � <br /> O \ Mw-2 w <br />' mo <br /> CANOPY 1 (<0 5) Li H8-2 <br /> r� • <br /> (<0 5) <br /> m 0j <br /> BULDM <br /> <500) <br /> 30" RC R DRAI PI <br /> C o I I W-6 / <br /> U it <br /> O <br /> I � I <br /> i <br /> COVERED ELEVATED UST #2 <br /> ' LOADING DOCK PRODUCT LINE <br /> DISPENSER PAD <br /> 12' FIRE MAIN <br /> 1 <br /> MW-5 <br /> • HH-1 <br /> (<O 5) <br /> ' LEGEND <br /> H13-1 HydroPunch Location (April 1998) <br /> HB-20)1K HydroPunch Location (February 1999) <br /> ' MW-2* Monitoring Well Location (February 2000) <br /> Figure B-4 <br /> * Not Used For Contouring <br /> (1,800) Benzene Concentration ,n Ag/L B nzene Concentrations in Ground Water <br /> ' N Former T271k2Area <br /> 100f Benzene Concentration Contour in Mg/L, 0 15 30 <br /> Dashed Where Inferredmwt-� A Folmar HeiM FaclRy <br /> FEET Tracy, California <br />