Laserfiche WebLink
Environmental <br /> Mr Harlin Knoll Resources <br /> 4 November 1998 Management <br /> Page 4 <br /> samples collected, we anticipate that no analyses will be performed for <br /> oxygenated compounds In the second round of samples collected <br /> If the results of the ground water samples collected from wells at the site <br /> demonstrate that the concentrations of TPH-g, BTEX, and oxygenated <br /> compounds are static or decreasing, Heinz intends to subnrut a request to <br /> the County for site closure (i e , "No Further Acton") based on a low risk <br /> to human health <br /> SCHEDULE FOR PROPOSED WORK <br /> Upon approval, ERM will commence the proposed scope of work <br /> outlined above ERM anticipates that approval can be obtained during <br /> the week of 2 November 1998 ERM anticipates that the monitoring well <br /> installation, development, and initial sampling can be performed during <br /> the week of 9 November 1998 The second round of ground water <br /> samples will be collected from all wells at the site during the week of 7 <br /> December 1998 <br /> Please call me at you earliest converuence at(925) 946-0455 to indicate the <br /> acceptance of this proposed scope of work <br /> Sincerely, <br /> Matt Brandy <br /> Project Engineer <br /> MLB/mlb/3374 40 <br /> cc Mr Scott Krall, Heinz - Pittsburgh, PA <br /> Mr Mark List, CVRWCB <br /> Ms Margaret Lagorio, SJCEHD <br />