My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PLEASANT
>
420
>
2900 - Site Mitigation Program
>
PR0540886
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:43:57 PM
Creation date
5/16/2019 10:06:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540886
PE
2960
FACILITY_ID
FA0023382
FACILITY_NAME
CENTRAL / MID PLUME PROJECT
STREET_NUMBER
420
Direction
S
STREET_NAME
PLEASANT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04502031
CURRENT_STATUS
01
SITE_LOCATION
420 S PLEASANT AVE
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • HEUt:NV <br /> MARS <br /> Q <br /> From: Lyman M Chano MARS j 2016 <br /> To: Cawbeer Nathan(&Waterhoard ,Q <br /> Cc: Wimlev Charl Chlor' ,ary.Ha k(a stanre,�.ro_n,; Philip Smith (Dsmith(a) anaan om) ENVIRONMENT <br /> Subject: Central Plume-Mid Plume Extraction Well "�'+,.;/ '� <br /> Date: Thursday,December 03,2015 1:40:16 PM 1Cpg�Tlni-i� <br /> Attachments: 015DO06 Cl f11 odf ` <br /> 015DO06 Ml(1)odf <br /> Nathan, <br /> Attached are part of the final plans for the TCE/PCE Central Plume Mid-Plume Extraction system that <br /> is slated for bidding on 12/19/16. The design is based on the response letter from your office dated <br /> March 9, 2015. The construction is expected to start March Of 2016 and should be completed by <br /> June of 2016. <br /> Please let me know if you need any more information or a copy of the signed plans. We will submit <br /> well installation report when it's completed. Thanks. <br /> Lyman Chang <br /> Interim City Engineer <br /> City of Lodi, Public Works Department <br /> 221 W Pine Street <br /> Lodi,CA 95240 <br /> (209)333-6800 ext. 2665 <br />
The URL can be used to link to this page
Your browser does not support the video tag.