Laserfiche WebLink
Re. Stefanos Gasoline Station` A enda for October 6 2003 <br /> Meeting �. <br /> 14.00 at the San Joa uin:Coup EHD Offices <br /> • introductions and project points-of-contact(5 min).. . <br /> Preliminary CPT results and 'review of(10'min). <br /> Overview of imp lementatiod- design, permitting (review.and approval), procurement <br /> '� 0 inin . <br /> d,startu 2 <br /> 'nstallation an ( ) <br /> tus i p <br /> funding sta <br /> rent/bu and fu g ),. <br /> installation and startup of SVE and ozone systems - anticipated <br /> Well installation, :,.. <br /> schedules (5 min). <br /> Action items and wrap-up - (5 min). <br /> Attending: Jeff Wong (EHD), Jeff Downs (Wright Env.), Mac Q, dir (Enpro) <br /> 3 <br /> E <br /> i <br /> r <br /> 1 <br />