t <br /> 3.0 CONCLUSIONS, RECOMMENDATIONS AND PROJECT STATUS <br /> Between July 29 and November 25, 2002, the groundwater surface dropped an average of 1 71 <br /> feet, the groundwater gradient increased very slightly from 0 0023 to 0 0024 foot/foot, and the <br />' groundwater flow direction remained relatively constant <br /> Between July 29 and November 25, 2002, the thickness of free product in MW-2 decreased <br /> slightly from 0 02 to 0 01 foot The plume of impacted groundwater at the water table appears to <br /> be defined and stable <br /> On the basis of CPT and discrete groundwater sampling results, the extent of impacted <br /> groundwater below the water table remains undefined As such, on April 8, 2002, Ramage <br /> Environmental recommended that a work plan be submitted, to further investigate the vertical and <br /> lateral extent of impacted groundwater beneath the water table, and to test the feasibility of soil <br /> and groundwater remedial options <br /> On January 27, 2003, EHD directed that the work plan be prepared to further define the extent of <br /> impacted groundwater and to initiate remedial feasibility testing at the site Currently, this work <br /> plan is in preparation <br /> r• In addition, the well network should continue to be monitored and sampled on a quarterly basis <br /> The next monitoring event is scheduled for February 2003 <br /> 1 <br /> r <br /> r <br /> 1 <br /> r <br /> r <br />