Laserfiche WebLink
Z14 4 Waste Manaqement <br /> Waste sod, equipment rinse water and purged groundwater generated during the drilling <br /> operations were contained in separate 55-gallon drums The drums were labeled and temporarily <br />' stored on-site, pending waste profiling and proper disposal or recycling On the date of <br /> publication of this report, final disposition of the wastewater and soil is still pending Final waste <br /> disposal will be documented separately <br /> r <br /> �' 12 <br />