Laserfiche WebLink
ti <br /> • WORK REQUEST FORM <br /> (Woolsey/Charter Way) <br /> Date of Request: 8/02/02 Requested Completion Date 8/7/02 <br /> 4 <br /> Prol Name: Woolsey/Charter Way Proj No: 294 <br /> Site Address: 1501 W. Charter Way, Stockton, CA Task: none <br /> Protect Manager: Greg.Stahl Field Personnel: Scoma <br /> Client Contact: Jim Lancaster Phone No: 948-9412, ext. 18 <br /> Regulatory Contact: Mike Infurna Phone No: 468-3454 <br /> Site Phone: 941-4934 (South Bay Tire) <br /> r <br /> zJ <br /> Approval: G Completion Date: 0?Jv4J0;z- ,Dr IZh C _ <br /> 'READ AND UNDERSTAND PRIOR TO LEAVING FOR SITE*** <br /> Quarterly groundwater monitoring and sampling <br /> • Notify Infurna and Jim Lancaster at least 48 hours prior to conducting fieldwork <br /> • Monitor DTW and DTB in three wells in order Order is MW2, MWI, MW3 MWI and <br /> MW2 are non-detect MW3 is hot. Wells are 2" diameter, 30 feet deep Water should be at <br /> about 16 feet below grade <br /> • You can dump and reuse drums from MWI and MW2 from last sampling round, all analytical <br /> was ND DON'T DUMP DRUM FROM MW3. <br /> • Contain purge water You can combine MW 1/MW2 only <br /> • Keep MW3 purgewater separate from MWI and MW2 purgewater <br /> • Purge and sample wells in order(MW2, MWI, MW3) Should be able to use centnfugal <br /> pump at around 1 5 gpm <br /> • Sample for TPHg/BTEX(801518020), TPHd (8015) and oxygenates (8260) no need to run <br /> EDB and DCA See me about also running samples for dissolved lead Samples to Argon, <br /> standard turnaround Write on COC that hard copy and EDF needed. <br /> • Use very good QC Make sure dfums are properly labeled and labels are legible Do accurate <br /> drum count Indicate location of drums on site map. <br />