Laserfiche WebLink
r <br />March 16, 1988 ` <br />r- . i 1 <br />r <br />Roberts Oil Company <br />Page 8 <br />California certified analytical laboratory. All soil cuttings generated by the <br />borehole drilling and sampling operations will be drummed and stored onsite. <br />Should the laboratory analyses indicate that the soils encountered during the <br />drilling and sampling operations be contaminated, it shall be the <br />responsibility of Roberts Oil Company to properly dispose of the <br />contaminated soils. Exceltech can assist Roberts Oil Company in making <br />arrangements for the transportation and proper disposal of contaminated <br />soils on a time and material cost basis. <br />Additional ground water quality monitoring wells (up to 3) will be installed <br />in selected boreholes upgradient and downgradient from the transfer <br />block/loading area, for the purpose of determining the intensity and lateral <br />extent of refined petroleum product contaminated ground water, and to <br />better define the hydraulic gradient and ground water flow direction. The <br />ground water quality monitoring wells to be installed will be completed in <br />the soil sampling boreholes drilled and sampled under Task 4. Exceltech will <br />obtain the necessary Permits to install the ground water quality monitoring <br />wells from the County of San Joaquin Local Health District (SJLHD). SJLHD <br />regulations require that the placement of sanitary grout seals be inspected <br />by a County employed inspector at the expense of the Owner of the Work. <br />Further, Roberts Oil Company will be required to sign an Authorization to <br />Release Analytical Results, Geotechnical Data and Site Assessment <br />Information to the SJLHD prior to installing the ground water quality <br />monitoring wells. All well screen/casing strings will be thoroughly steam <br />cleaned prior to insertion in the borehole. All wel! construction materials <br />(gravel pack, bentonite, and cement) will be stockpiled away from drilling <br />activities on plastic sheeting to prevent contamination. <br />When the desired drilling depth has been reached, PVC casing, well screen, <br />gravel pack, and bentonite seal will be installed inside the hollow stem <br />auger string. After installation of well construction materials, the hollow <br />stem auger string will be removed, leaving ithe completed well installation <br />in the borehole. The cement/bentonite grout seal will then be tremied into <br />place in the presence of a SJI.HD Inspector. <br />