My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
681
>
2900 - Site Mitigation Program
>
PR0505449
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 9:34:44 AM
Creation date
5/16/2019 2:52:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0505449
PE
2953
FACILITY_ID
FA0006730
FACILITY_NAME
CLAUDE C WOOD CO
STREET_NUMBER
681
Direction
E
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04905002
CURRENT_STATUS
02
SITE_LOCATION
681 E LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
AMeuangkhoth
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOBSITE SAFETY PLAN <br /> A. Persons to contact in case of emergency: <br /> B. Hospitals in area: <br /> Doctors Hospital of Manteca 209-823-3111 <br /> St. Josephs Medical Center 209-943-2000 <br /> Dameron Hospital 209-944-5550 <br /> San Joaquin General Hospital 209-468-6000 <br /> Lodi Memorial Hospital 209-334-3411 <br /> Tracy Memorial Hospital 209-835-1500 <br /> C. Ambulance Service: <br /> Manteca Ambulance Service 209-823-1032 <br /> All-City Ambulance 209-464-4846 <br /> Life-Medical 209-464-4846/334-0830 <br /> Stockton Ambulance 209-948-6056 <br /> D. A First Aid kit will be readily available on-site at all times the location of which <br /> will be covered in the "Tailgate Safety Meeting". <br /> E. Fire Department: Call 911. <br /> F. The job site is enclosed by a security fence and the excavation will be barricaded or <br /> coned off and caution tape will be used to delineate the exclusion zone. <br /> G. Construction personnel will work in a safe and organized manner. <br /> H. In the event that chemicals or hazardous materials other than those already known to <br /> EHD are discovered, the Site Safety Officer will notify EHD immediately (within 24 <br /> hours). <br /> I. The following safety equipment and clothing shall be worn at all times on the job site. <br /> A. Safety goggles C. Steel Toe shoes <br /> B. Hard hat D. Tyvek Coveralls-if needed <br /> J. A Fire Extinguisher will be present on site when any power equipment is being used. <br />
The URL can be used to link to this page
Your browser does not support the video tag.