My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001606
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1521
>
3500 - Local Oversight Program
>
PR0544466
>
ARCHIVED REPORTS XR0001606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 3:33:47 PM
Creation date
5/16/2019 3:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001606
RECORD_ID
PR0544466
PE
3528
FACILITY_ID
FA0005303
FACILITY_NAME
HOLT OF CALIFORNIA
STREET_NUMBER
1521
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337015
CURRENT_STATUS
02
SITE_LOCATION
1521 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RZAMWAV � <br /> Working To Restore Nature <br /> Excavated soil will be stockpiled on site, placed and covered with 6 mil plastic sheeting, pending <br /> determination of appropriate remediation/disposal Composite soil samples will be collected as <br /> needed to characterize the soil with regard to remediation/disposal options <br /> Report Preparation <br /> Following completion of field activities and receipt of laboratory analyses, field activities and <br /> results will be summarized In a technical report The report will include a discussion of site <br /> history, local hydrogeologic setting, field activities, and laboratory results <br /> Schedule <br /> Holt Bros is currently soliciting bids for the construction of a new loading ramp to replace the <br /> existing ramp which will presumably be destroyed during soil excavation activities A <br /> replacement loading ramp will allow Holt Bros to function while the excavation and remediation <br /> activities progress Holt Bros anticipates excavation activities to begin subsequent to the <br /> construction of the replacement ramp in the summer of 1994 <br /> If you have any questions or comments please feel free to contact John Lane at (209) 838-3507 <br /> Respectfully, <br /> RESNA Industries Inc <br /> hn P Lane <br /> Project Geologist <br /> 1 i <br /> Gregory P Stahl <br /> CA Registered Geologist No 5023 <br /> TJL/ggk <br /> Attachments <br /> cc Mr. Al Kroger, Holt Bros <br /> Ow OW44O21REPORTS%WP-1143 FNL 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.