Laserfiche WebLink
RZAMWAV � <br /> Working To Restore Nature <br /> Excavated soil will be stockpiled on site, placed and covered with 6 mil plastic sheeting, pending <br /> determination of appropriate remediation/disposal Composite soil samples will be collected as <br /> needed to characterize the soil with regard to remediation/disposal options <br /> Report Preparation <br /> Following completion of field activities and receipt of laboratory analyses, field activities and <br /> results will be summarized In a technical report The report will include a discussion of site <br /> history, local hydrogeologic setting, field activities, and laboratory results <br /> Schedule <br /> Holt Bros is currently soliciting bids for the construction of a new loading ramp to replace the <br /> existing ramp which will presumably be destroyed during soil excavation activities A <br /> replacement loading ramp will allow Holt Bros to function while the excavation and remediation <br /> activities progress Holt Bros anticipates excavation activities to begin subsequent to the <br /> construction of the replacement ramp in the summer of 1994 <br /> If you have any questions or comments please feel free to contact John Lane at (209) 838-3507 <br /> Respectfully, <br /> RESNA Industries Inc <br /> hn P Lane <br /> Project Geologist <br /> 1 i <br /> Gregory P Stahl <br /> CA Registered Geologist No 5023 <br /> TJL/ggk <br /> Attachments <br /> cc Mr. Al Kroger, Holt Bros <br /> Ow OW44O21REPORTS%WP-1143 FNL 4 <br />