My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001621
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1521
>
3500 - Local Oversight Program
>
PR0544466
>
ARCHIVED REPORTS XR0001621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 3:29:44 PM
Creation date
5/16/2019 3:23:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001621
RECORD_ID
PR0544466
PE
3528
FACILITY_ID
FA0005303
FACILITY_NAME
HOLT OF CALIFORNIA
STREET_NUMBER
1521
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337015
CURRENT_STATUS
02
SITE_LOCATION
1521 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3 Delivery of Samples to Laboratory <br /> Samples will be maintained at 4 °C and delivered to the <br /> laboratory on a daily basis. Shipping containers will be <br /> sealed with security tape to assure sample integrity during <br /> shipping. Delivered samples will be accompanied by a chain- <br /> of-custody record. <br /> 4.0 Sampling and Drilling Equipment Decontamination <br /> All equipment used for drilling and sampling soil and <br /> groundwater will be decontaminated prior to use . Well <br /> construction materials will be decontaminated before instal- <br /> lation. All equipment used for collection of more than one <br /> sample, such as bailers and split--spoon samplers, will be <br /> decontaminated between each use to prevent cross contamina- <br /> tion between samples. Drilling equipment will be decontami- <br /> nated prior to commencing drilling at each hole. <br /> Equipment and well material decontamination will be <br /> conducted on an impermeable surface and all decontamination <br /> effluent will be contained. All surfaces of the equipment <br /> will be thoroughly cleaned with a steam cleaner. The <br /> equipment will be placed on a drying rack for air drying. <br /> The decontamination water will stored in containers <br /> certified for hazardous materials storage and disposed of in <br /> an approved manner. <br /> Sample equipment to be used for pesticides and organic <br /> analysis will be washed in a nonphosphate detergent (Alconox <br /> or equivalent) and rinsed with tap water , followed by <br /> deionized water and finally with acetone. If the equipment <br /> is for metals analysis, the initial rinse will be conducted <br /> with 0 . 1 N nitric acid followed by tap water and deionized <br /> water. <br /> 5.0 Field Equipment Calibration and Maintenance <br /> The following measuring equipment may be used during the <br /> Remedial Investigation . Equipment is grouped by field <br /> activity. Calibration procedures and frequency are listed- <br /> for each piece. <br /> Soil Borings and Well Installation- Steel and coated cloth <br /> tape. Calibration: none. <br /> Water Level Measurements in Wells- Steel surveyors tape. <br /> Calibration: manufacturer supplied temperature correction <br /> will be applied as applicable for field conditions. Elec- <br /> trical well sounders . Calibration : check against steel <br />. surveyor ' s tape. <br /> organic vapors- Photoionization detector. Calibration: <br /> Daily field Calibration using a isobutylene standard. <br />
The URL can be used to link to this page
Your browser does not support the video tag.