Laserfiche WebLink
Well Development Protocol <br /> Groundwater monitoring wells will be developed by removing <br /> approximately 10 times the volume of water in the casing or <br /> --- -- - -- —until- relatively-free-of--sand- and-silt;-if-possible. Casing <br /> volumes will be calculated in the following manner: <br /> Volume of Schedule 40 PVC Pipe <br /> Diameter I.D. Volume <br /> (inches) (inches) Gal/linear ft. <br /> ------------------------------------------ <br /> 2 2.067 0.17 <br /> 4 4.026 0.66 <br /> . Volume of Open Borehole and Annular Space <br /> Between Casing and Hole <br /> Volume/ Volume/ <br /> Hole linear ft. Nominal linear ft. of* <br /> Diameter of hole Casing Diameter Annular Space <br /> (inches) Gal. Cu. ft. (inches) Gal. Cu. Ft. <br /> ----------------------------------------------------------------- <br /> 7.25 2 .14 0. 29 2 1.91 0.26 <br /> 8.25 2 .78 0. 37 2 2.55 0.34 <br /> 10.25 4 .29 0.57 2 4. 06 0.54 <br /> 10.25 4 .29 0. 57 4 3 .46 0.46 <br /> 12. 25 6. 13 0. 82 4 5. 30 0.71 <br /> *Note: Annular volumes will be multiplied by 30% to account for <br /> porosity of filter pack. <br /> If the aquifer is slow to recharge, development will continue <br /> until recharge is too slow to practically continue. The <br /> volume of water produced versus time will be recorded. <br />