My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1904
>
2900 - Site Mitigation Program
>
PR0505548
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 9:08:02 AM
Creation date
5/17/2019 8:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0505548
PE
2960
FACILITY_ID
FA0006852
FACILITY_NAME
OCCIDENTAL CHEMICAL CORP
STREET_NUMBER
1904
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16302041
CURRENT_STATUS
01
SITE_LOCATION
1904 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.02 U4 <br /> JUL-02-2001 14:50 BENNETTRERLTYGROUP <br /> i <br /> Via Facsimile (559) 264-7431 <br /> June 22, 2001 <br /> Mr. Tim Souther <br /> Geomatrix Consultants, Inc <br /> 2444 Main Street, Suite 215 <br /> Fresno, CA 93721 <br /> Re: Access Agreement for Limited Additional Groundwater Assessment <br /> Bridgeport Trails Development -Unit 5 <br /> Stockton, California <br /> Dear Mr. Souther: <br /> We understand that Geomatrix Consultants, Inc. (Geomatrix) submitted a workplan to the <br /> California Regional Water Quality Control Board (RWQCB)on June 1, 2001 to conduct a limited <br /> additional groundwater assessment on property owned by San Joaquin Valley Associates, known <br /> as and to become Bridgeport Trails Development Unit 5 (Geomatrix 2001 of Workplan; included <br /> as Attachment 1). According to the Workplan,.Geomatrix proposes to drill nine soil borings to <br /> approximately 30 feet below ground surface (bgs)at locations A through G on Unit 5, as shown on <br /> Figure 1. Temporary groundwater monitoring wells will be installed in the borings in the shallow <br /> zone interval. Well construction will consist of perforated 2-inch diameter casing between about <br /> 12 and 27 feet bgs and a surface well seal from about 0 to 9 feet bgs. The wells will be <br /> developed, purged, and sampled, and groundwater samples will be sent for laboratory analysis. <br /> San Joaquin Valley Associates hereby grants Geomatrix access to the property shown in Figure 1 <br /> to conduct the activities described in the Limited Additional Groundwater Assessment Workplan <br /> (Geomatrix 2001) subject to the terms and conditions in this letter. <br /> This grant of access is limited to the work described in the Workplan and the subsequent <br /> conversion of certain of the temporary groundwater monitoring wells to permanent wells and the <br /> associated abandonment of the remaining temporary wells. Geomatrix shall conduct all such work <br /> consistent with the standard of care appropriate to environmental consultants for this type of work. <br /> Geomatrix shall provide copies of all data to San Joaquin Valley Associates or its agents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.