My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1904
>
2900 - Site Mitigation Program
>
PR0505548
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 9:18:25 AM
Creation date
5/17/2019 8:58:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505548
PE
2960
FACILITY_ID
FA0006852
FACILITY_NAME
OCCIDENTAL CHEMICAL CORP
STREET_NUMBER
1904
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16302041
CURRENT_STATUS
01
SITE_LOCATION
1904 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
579
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM ORDER NO. R5-2008-0149-027 3 <br /> OXYCHEM STOCKTON, 1904 CHARTER WAY,SAN JOAQUIN COUNTY <br /> Footnotes to Table 2 <br /> ' Or an equivalent EPA Method that achieves the maximum Practical Quantitation Limit. <br /> All concentrations between the Method Detection Limit and the Practical Quantitation Limit shall be reported as an estimated value. <br /> FIELD SAMPLING <br /> In addition to the above sampling and analysis, field sampling and analysis shall be conducted <br /> each time a monitor well or extraction well is sampled. The sampling and analysis of field <br /> parameters shall be as specified in Table 3. <br /> Table 3: Field Sampling Requirements <br /> Parameters Units Type of Sample <br /> Groundwater Elevation Feet, Below Top of Casing Measurement <br /> Oxidation-Reduction Potential Millivolts Grab <br /> Electrical Conductivity microSiemens/cm Grab <br /> Dissolved Oxygen mglL Grab <br /> pH pH Units (to 0.1 units) Grab <br /> Field test instruments (such as those used to test pH and dissolved oxygen) may be used <br /> provided that: <br /> 1. The operator is trained in proper use and maintenance of the instruments; <br /> 2. The instruments are calibrated prior to each monitoring event; <br /> 3. Instruments are serviced and/or calibrated by the manufacturer at the recommended <br /> frequency; and <br /> 4. Calibration reports are submitted as described in item (b) of the "Reporting" section of <br /> this MRP. <br /> DISCHARGE MONITORING <br /> The Discharger shall monitor daily the discharge of water and amendments that are injected <br /> into the groundwater according to the requirements specified in Table 4. Each amendment <br /> addition shalt be recorded individually, along with information regarding the time period over <br /> which the amendment was injected into the aquifer. <br /> Table 4: Discharge Monitoring Requirements <br /> Parameters Units Type of Sample <br /> Injected Volume gallons per day Meter <br /> Amendment(s) Added kilograms per day Measured <br /> Biocide Added kilograms per day Measured <br />
The URL can be used to link to this page
Your browser does not support the video tag.