Laserfiche WebLink
• 0 <br /> MONITORING AND REPORTING PROGRAM ORDER NO. R5-2008-0149-027 5 <br /> . OXYCHEM STOCKTON, 1904 CHARTER.WAY,SAN JOAQUIN COUNTY <br /> (c) groundwater contour maps for all groundwater zones, if applicable; <br /> (d) pollutant concentration maps for all groundwater zones, if applicable; <br /> (e) a table showing well construction details such as well number, groundwater zone being <br /> monitored, coordinates (longitude and latitude), ground surface elevation, reference <br /> elevation, elevation of screen, elevation of bentonite, elevation of filter pack, and elevation <br /> of well bottom; <br /> (f) a table showing historical lateral and vertical (if applicable) flow directions and gradients; <br /> (g) cumulative data tables containing the water quality analytical results and depth to <br /> groundwater; <br /> (h) a copy of the laboratory analytical data report, which may be submitted in an electronic <br /> format; <br /> (i) the status of any ongoing remediation, including an estimate of the cumulative mass of <br /> pollutant removed from the subsurface, system operating time, the effectiveness of the <br /> remediation system, and any field notes pertaining to the operation and maintenance of the <br /> system; and <br /> (j) if applicable, the reasons for and duration of all interruptions in the operation of any <br /> remediation system, and actions planned or taken to correct and prevent interruptions. <br /> An Annual Report shall be submitted to the Central Valley Water Board by 1 November of <br /> each year, and may be combined with an Annual Report that may be required by a separate <br /> Monitoring and Reporting Program for this site. This report shall contain an evaluation of the <br /> effectiveness and progress of the investigation and remediation, and maybe substituted for <br /> the second semi-annual monitoring report. The Annual Report shall contain the following <br /> minimum information: <br /> (a) both tabular and graphical summaries of all data obtained during the year; <br /> (b) groundwater contour maps and pollutant concentration maps containing all data obtained <br /> during the previous year; <br /> (c) a discussion of the long-term trends in the concentrations of the pollutants in the <br /> groundwater monitoring wells; <br /> (d) an analysis of whether the pollutant plume is being effectively treated; <br /> (e) a description of all remedial activities conducted during the year, an analysis of their <br /> effectiveness in removing the pollutants, and plans to improve remediation system <br /> effectiveness; <br />