My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2000
>
2900 - Site Mitigation Program
>
PR0507920
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 9:27:06 AM
Creation date
5/17/2019 9:23:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507920
PE
2950
FACILITY_ID
FA0007836
FACILITY_NAME
SUNSTATE EQUIPMENT CO LLC
STREET_NUMBER
2000
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
2000 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� D <br /> Scope of Work For 2,000 West Chatter Way, Stockton, California APR 16 1998 <br /> Start Date: Tuesday March 24, 1998 <br /> ENVIRONMENTAL HEALTH <br /> Purpose: Soil and groundwater sampling and testing is planned to provide information in RgSAPES <br /> decisions and provide background data for the site. This is a screening assessment only, and has <br /> been designed to evaluate the potential impact to the site by leaking underground storage tanks <br /> (LUSTS) and septic systems in the site vicinity. GEC has not identified a significant release of <br /> petroleum or hazardous materials at the site. <br /> Background: The site is located between two facilities with histories of LUST systems, i.e., New Holland <br /> Tractor to the west and a former Purgro warehouse facility to the east. One groundwater <br /> monitoring well, at the Puregro facility, has been identified within 150 feet of the site and is <br /> shown on the attached figure. Records obtained from San Joaquin County indicate no septic <br /> systems have been identified within 500 feet of the LUST on the property adjacent to the east; <br /> and a septic system near the northeast comer of the Puregro facility is in excess of 150 feet of <br /> the site. GEC understands that sewer service is not available to the site but, we have-not <br /> identified documentation regarding the presence or location of a septic system at the site. <br /> Scope: Direct push 4 soil borings to a depth just above the shallow groundwater collecting soil samples <br /> at intervals of approximately 5 feet. On soil sample from each boring will be analyzed by a <br /> California licensed analytical laboratory for petroleum hydrocarbons (EPA Method 8015M) and <br /> benzene, toluene, ethylbenzene, and total xylenes(EPA Method 8020A). <br /> Additionally two of the borings will be used to collect groundwater samples by direct push or <br /> driven casing sampling methodology(e.g. Hydro-punch). This method will be used in order to <br /> minimize the potential for cross-contamination between the unsaturated and saturated intervals. <br /> Groundwater samples will be analyzed by a California licensed analytical laboratory for <br /> petroleum hydrocarbons (EPA Method 8015K and benzene, toluene, ethylbenzene, and total <br /> xylenes (EPA Method 602). <br /> Soil and groundwater sampling,handling, and documentation of collection will be performed in <br /> accordance with the GEC standard operating procedure(SOP)which is attached. The GEC SOP <br /> is written for Hydro-putsch methods but will apply, other than dimensional specification, to the <br /> actual method of direct push selected. <br /> Borehole <br /> locations: Selected locations are identified on the attached site map. These borehole locations may be <br /> altered in the field based on review of data obtained during the site investigation. However the <br /> borings will be drilled within the boundaries of the property identified as 2,000 West Charter <br /> Way as shown on the attached Figure. <br /> Destruction of <br /> Boreholes: Upon completion of groundwater sampling activities, the testholes will be grouted from total <br /> depth to surface through the outer casing of the drilling equipment. <br /> Duration: The work is expected to require approximately 6 hours and should be completed prior to the end <br /> of the work day, Tuesday March 18, 1998. <br /> F:\HOME\SKAMINSK\Letters\98-OW5A.permit—scope.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.