My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2150
>
3500 - Local Oversight Program
>
PR0544470
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 9:53:36 AM
Creation date
5/17/2019 9:44:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544470
PE
3528
FACILITY_ID
FA0006045
FACILITY_NAME
TCI LEASING AND RENTAL
STREET_NUMBER
2150
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
2150 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA GEORGE DEUKMEJIAN,Governor <br /> CALIFORNIA REGIONAL WATER QUALITYCONTROL= BOARD <br /> CENTRAL VALLEY REGION <br /> 3443 ROUTIER ROAD <br /> SACRAMENTO,CA 95827-3098 g �( <br /> Y <br /> 15 November 1989 <br /> Ms. Diane Hinson' _ <br /> Supervising REHS _ <br /> San Joaquin County <br /> ff Department of Public Health:'Services- <br /> I <br /> _ Environmental Health Division <br /> P 07-83x-2009 _ <br /> Stockton CA 952014 <br /> STOCKTON FORD NEW HOLLAND- .2150 WEST CHARTER WAY; STOCKTON:, -_ SITE <br /> ASSESSMENT ADDENDUM <br /> fi <br /> We have' reviewed the October, -1989` Site Assessment Addendum prepared, by <br /> McLaren Engineering for this, site. The- Addendum' ancl:udes .the analytical <br /> results from one round of .`�sampling of the on-site.`g"mon itori ng wells.' <br /> Hydrocarbon contamination was detected- in soil 'on-site. However, no <br /> contaminants were detected in the ground water moni tori ng well's during <br /> the initial round of sampling <br /> On-site bioremediation is proposed to '-treat the -hydrocarbon contaminated <br /> soils. Because no contaminants were detected, in'ground water. on=site- no: <br /> 4 additional sampling`of the ground water .monitoring' wells is proposed. We <br /> believe that- at minimum., the existing ground-,water monitoring wells ' <br /> should be resampl ed .to' confirm the results of ,:`the initial round of <br /> sampling. o provide comments onsthe _bioremediation proposal z <br /> p g. We will of- <br /> - al-so --provide <br /> after it is submitted.' .. _ <br /> 'If you have any, questions, please cal"1` me at :(916) 361 5Z3L. 4 <br /> THOMAS D. P.ELTIER: <br /> Engineering Geologist - <br /> TDP/tdp <br /> - � <br /> �-u�, J: r�c�-ww Gl's -Scv��+.�1'-f,•.. �.Qe.. �;,`l c�� �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.