Laserfiche WebLink
' KLEINFELDER <br /> A-2.4 Preparation of Samples <br /> ' Each sample will be individually labeled. The label includes Kleinfelder's name,job number, the <br /> date and time the sample was collected, the employee number of the individual who performed <br /> the sampling, and a unique five-digit sample identification number. <br /> ' A-2.5 Sample Handling <br /> After labeling, the sample is immediately stored in an iced cooler for transport to Kleinfelder's <br /> office sample control or to the analytical laboratory. A Kleinfelder chain-of-custody form <br /> accompanies the cooler. The chain-of-custody form includes Kleinfelder's name, address and <br /> telephone number, the employee number of the individual who performed the sampling, the <br /> ' sample numbers, the date and time the samples were collected, the number of containers each <br /> sample occupies, and the analyses for which the samples are being submitted, if any. The chain- <br /> of-custody form is signed by each person who handles the samples, including all Kleinfelder <br /> employees and the receiving employee of office sample control or the analytical laboratory when <br /> ' the samples are delivered. <br /> A-2.6 Decontamination of Equipment <br /> ' To reduce the potential for cross-contamination, Geoprobe pipe and associated equipment are <br /> steam cleaned prior to advancing each boring. In addition, sampling equipment is cleaned with a <br /> trisodium-phosphate wash and rinsed with distilled water prior to collecting each soil sample. <br /> A-2.7 Soil Cutting Disposal <br /> ' It is not anticipated that soil cuttings will be generated requiring disposal during the Geoprobe <br /> investigation. <br /> A-2.8 Geoprobe Closure <br /> Upon completion of Geoprobe sampling, the borings will be closed by backfilling the borings <br /> ' with a neat cement grout, or bentonite powder. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 23-485060-1\.SAC2R335 A-2 July 30,2002 <br /> Copyright 2002 Kleinfelder,Inc. <br />