My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2245
>
2900 - Site Mitigation Program
>
PR0518735
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 11:47:36 AM
Creation date
5/17/2019 11:46:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518735
PE
2960
FACILITY_ID
FA0010721
FACILITY_NAME
HELENA CHEMICAL CO
STREET_NUMBER
2245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16336017
CURRENT_STATUS
01
SITE_LOCATION
2245 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' TABLE OF CONTENTS <br /> ' 1.0 INTRODUCTION...............................................................................................................................1 <br /> 2.0 PROJECT BACKGROUND..............................................................................................................1 <br /> ' 3.0 SITE PREPARATION........................................................................................................................3 <br /> 4.0 SOIL AND GROUNDWATER SAMPLING FIELDWORK.........................................................3 <br /> ' 5.0 SOIL AND GROUNDWATER ANALYSIS AND DISPOSAL......................................................4 <br /> 6.0 PROPOSED MONITORING WELL LOCATIONS AND SAMPLE INTERVALS....................4 <br /> ' 7.0 BORINGS AND WELL INSTALLATION FIELD PROCEDURES.............................................4 <br /> 7.1 MONITORING WELL INSTALLATION FIELD PROCEDURES ..................................................4 <br /> 7.2 MONITORING WELL SURVEYING, DEVELOPMENT, AND SAMPLING................................5 <br /> 7.3 GROUNDWATER MONITORING WELL DEVELOPMENT AND SAMPLING..........................5 <br /> 8.0 REPORTING.......................................................................................................................................6 <br /> ' 9.0 PROJECT SCHEDULE......................................................................................................................6 <br /> ' APPENDICES <br /> APPENDIX A <br /> Figure I —Vicinity Map <br /> Figure 2—Site Map with Proposed Boring Locations <br /> Figure 3—Generalized Soil Boring Diagram <br /> Figure 4—Monitoring Well Construction Diagram <br /> ' APPENDIX B <br /> Table A—Historic Groundwater Monitoring Data <br /> Table B—Historic Groundwater Gradient Data <br /> Table C—Historic Soil (Tank Removal) Laboratory Analytical Data <br /> Table D—Historic Soil Laboratory Analytical Data <br /> ' Site Specific Health and Safety Plan <br /> 1 <br /> ' �� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.