My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:10:08 PM
Creation date
5/17/2019 1:57:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Geological Audit Services Inc. <br /> _w= Environmental Professionals <br /> t� 1803 March Lane, Suite A•Stockton, CA 95207-6414•(209) 956-0264•Fax(209)956-0700 <br /> February 28, 1995 <br /> SI'-93-03-033-02 <br /> Ms. Elizabeth Thayer <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD m <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road <br /> Sacramento, CA 95827-3098 <br /> Subject: Drilling of Soil Borings (Bioremediation Progress Monitoring) y <br /> Geweke Land Development and Marketing a <_ <br /> 16 South Cherokee Lane, Lodi, California <br /> CAa <br /> Dear Ms. Thayer: <br /> In accordance with the monitoring requirements for the referenced site, Geological Audit <br /> Services, Inc. (GeoAudit) has scheduled the second series of soil borings for bioremediation <br /> mouitoJ'ing at 16 South Cherokee Lane, in Lodi, California. The drilling will begin on <br /> Monday, March 13, 1995, at approximately 8:00 am. <br /> Four soil borings are planned for the site. The borings will continue the boring pattern <br /> previously drilled at the site. One boring will be drilled approximately nine feet west of VW- <br /> 1, towards VW-7. A second boring will be drilled approximately six feet northeast of VW-4, <br /> towards VW-6. A third boring should be drilled three feet northwest of VW-2, towards <br /> VW-1. The fourth boring should be drilled three feet northwest of VW-6, towards VW-5. <br /> Quarterly groundwater monitoring will also be performed on March 13, 1994. If you have <br /> any questions concerning the proposed location of the soil borings, please contact our office <br /> as soon as possible. <br /> Sincerely, <br /> GEOLOGICAL AUDIT SERVICES, INC. <br /> 92��atn <br /> Bob Marty , <br /> Project Manager <br /> J <br /> W; Mr.Marl Gcweke,Mr.Dale Gillespie-GLDM <br /> htLJames Deme(a <br /> Mr.Harlin Knout PHSIEHD <br /> 0.obyal'J,u—,I- I <br /> 1]M1aw5RWuk b2Yr <br /> • Full Spectrum Environmental Services• Hydrogeology <br />
The URL can be used to link to this page
Your browser does not support the video tag.