My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
348
>
2900 - Site Mitigation Program
>
PR0518922
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:19:45 PM
Creation date
5/17/2019 1:59:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518922
PE
2960
FACILITY_ID
FA0014223
FACILITY_NAME
HESS DUBOIS
STREET_NUMBER
348
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
348 W HARDING WAY
P_LOCATION
01
QC Status
Approved
Scanner
AMeuangkhoth
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 March 2003 <br /> AGE-NC Project No. 95-0114 <br /> Page 7 of 11 <br /> 3.3. COLLECTION OF SOIL GAS SAMPLES <br /> Based on the site soil and ground water data,AGE will advance fifteen soil gas probe-borings to a <br /> depth of 35 feet bsg, collecting- soil gas samples at depths of 20 and 35 feet bsg to delineate the <br /> lateral extent of contaminated soil; if additional probe borings are required for delineation, the <br /> sampling location will be approved by the CVRWQCB prior to additional work. <br /> The collected soil gas samples will be analyzed for: <br /> • Chlorinated hydrocarbons(including PCE/,Cis-1,2 DCA and vinyl chloride) and BTEX by <br /> EPA Method 8260 <br /> • Total petroleum hydrocarbons quantified as stoddard solvents (TPH-ss) by EPA Method <br /> 8015 Modified. <br /> All sampling tools and probe rods used for sample collection will be thoroughly rinsed with clean <br /> water after washing with a solution of Alconox, if appropriate. <br /> 3.4. REPORT PREPARATION <br /> Following the additional site investigation, a report will be prepared presenting the findings. The <br /> report will include a description of work performed and the results of the soil/groundwater sampling <br /> and analysis;conclusions and recommendations will also be included.The report will be in a format <br /> acceptable to CVRWQCB guidelines, and will be reviewed and signed by a California Registered <br /> Geologist. <br /> 4.0. FIELD PROCEDURES <br /> Procedures for boring advancement, soil-gas sampling and monitoring well installation and <br /> monitoring procedures are outlined below. All field procedures will be overseen by an AGE <br /> representative under the supervision of a California Registered Geologist. <br /> 4.1. PILOT BORINGS AND MONITORING WELL INSTALLATION <br /> Monitoring well pilot borings will be advanced utilizing a truck-mounted, hollow-stem drill rig <br /> equipped with 8.25-inch diameter hollow-stem augers. Cuttings generated during drilling activities <br /> and rinseate will be containerized in properly labeled DOT-approved 55-gallon drums, and stored <br /> Advanced GeoEnvironmental,Lu. <br />
The URL can be used to link to this page
Your browser does not support the video tag.