0 <br /> PROPOSED WORK PLAN FOR <br /> REMEDIATION PROGRESS MONITORING: <br /> SOIL BORING DRILLING <br /> Geweke <br /> 16 South Cherokee Lane <br /> Lodi, California <br /> December 28, 1993 <br /> 1.0 INTRODUCTION <br /> At the request of Mr. Mark Geweke of Geweke Land Development& Marketing(GLDM), <br /> Geological Audit Services, Inc. (GeoAudit) has prepared this work plan for remediation <br /> progress monitoring at 16 South Cherokee Lane in Lodi, California. This work plan is <br /> prepared in response to a letter from Ms. Elizabeth Thayer of the Central Valley Regional <br /> Water Quality Control Board (CVRWQCB), dated December 9, 1993. <br /> 2.0 BACKGROUND <br /> History and background information concerning the site is documented in the Final <br /> Remedial Plan (FRP) submitted to the CVRWQCB on July 30, 1993, and in <br /> correspondence between GeoAudit and Ms. Elizabeth Thayer between August and <br /> December of 1993. <br /> 3.0 SCOPE OF WORK <br /> In accordance with a letter to the CVRWQCB dated December 28, 1993, GeoAudit <br /> proposes to drill "remediation progress soil borings" on or about the following dates: April <br /> 1, June 1, September 1, and December 1, 1994 as well as March 1 and September 1, 1995. <br /> 3.1 Soil Boring Locations <br /> A minimum of two soil borings will be drilled during each "progress"monitoring. The initial <br /> progress monitoring will be centered near VW-4 soil borings will be drilled approximately <br /> (5) feet northwest of VW-4 (between VW-4 and MW-4; see Figure 3 for well locations; <br /> [proposed soil borings not shown on map]). If little or no contamination is detected in this <br /> soil boring, a second soil boring will be drilled (10) feet south-southeast of VW-4. However, <br /> if contamination is encountered, the second soil boring will be drilled approximately (3) feet <br /> north of VW-4. <br /> 0_1,Nt AUM11 U. ,Ii 1 <br />