My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:14:40 PM
Creation date
5/17/2019 2:01:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PETE WILSON, Governor <br /> 'STATE OF CALIFORNIA <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD— <br /> CENTRAL VALLEY REGION uOr <br /> 3443 ROUTIER ROAD. SUITE A <br /> S ACRAMENTO, CA 95827-3098 ' <br /> PHONE: (916) 361-5600 ._ <br /> FAX: (916) 361-5686 $ -nn <br /> 31 March 1992 N71F ITi ` , L <br /> Mr. Steve Schneider <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> CLEANUP AND ABATEMENT ORDER NO. 90-702, GEWEKE FORD, 16 S. CHEROKEE LANE, <br /> LODI, SAN JOAQUIN COUNTY <br /> I have reviewed the "Final Remedial Action Work Plan" (FRP) , dated 2 January <br /> 1992, prepared by Geological Audit Services, Inc. (GAS) for Geweke, and <br /> submitted in accordance with the revised due date, 2 January 1992. I do not <br /> object to the proposed remedial actions in concept (which consist of soil <br /> vapor extraction with incineration of the extracted vapors and ground water <br /> extraction and carbon filtration with reinjection of the treated ground <br /> water) . However, the FRP was incomplete. See the attached memorandum for my <br /> comments . <br /> By 30 Apri,1 1992, Geweke must submit an addendum to the FRP containing the <br /> following: <br /> 1 . Maps and figures depicting the extent of soil and ground water <br /> contamination; <br /> 2. A complete discussion of the soil vapor extraction system including: <br /> A. The reference to 500 ppm as hexane and the proposed procedure and <br /> rationale for determining when vapor extraction is no longer <br /> necessary; <br /> B. The rationale for extending the vapor extraction well screens from <br /> 4 to 70 feet rather than installing cluster wells at discrete <br /> depths; <br /> C. A proposal to investigate and remediate the soil layers previously <br /> in contact with contaminated ground water. <br /> 3. A complete discussion of the ground water extraction, remediation, and <br /> reinjection system, including: <br /> A. The location of an extraction well , which contains sufficient <br /> water to be used for extraction all year, either the existing EW-1 <br /> or a new well to be constructed near or as a replacement for MW-4; <br />
The URL can be used to link to this page
Your browser does not support the video tag.