Laserfiche WebLink
._. I � �� <br /> PMR I Y� 3 <br /> x , <br /> t <br /> :7h 7F QF CALIFORNIA <br /> uEOAGE PEUKMEJIAY Ga.xnv. <br /> CALIFORNIA REGIONAL SAIATER QUALITY CONTROL BOARD-- <br /> CENTRAL VALLEY REGION <br /> 2-3.,R06TIEF ROAD, SUITE A t <br /> AgALNTQ. GA 95827-30_5 f <br /> { <br /> 31 August 1990 CERTIFIED MAIL <br /> P 354 404 354 <br /> Mr. Keith Howard <br /> Cooper, White & Cooper <br /> ' 1333 N. California Boulevard. Suite 450 <br /> Walnut Creek, CA 94596 <br /> GEWEKE LAND DEVELOPMENT AND MARKETING PROPERTY (GEWEKE), 16 SOUTH CHEROKEE LANE, LODI - <br /> CLEANUP AND ABATEMENT ORDER N0. 90-702 - SITE INVESTIGATION REPORT <br /> We have reviewed the 23 August 1990 Sits Investigation Report prepared by Brown and <br /> Caldwell Consultants for this site. SigniFicant levels of hydrocarbons were detected <br /> in samples from three of the four newly installed monitoring wells. The only well <br /> which showed no hydrocarbons was the upgradient well <br /> We agree with your consultants conclusion that dissolved phase pztroleum hydrocarbons - <br /> have migrated off-site beydid the locations of the newly installed monitoring wells. s <br /> 'L Therefore, it will be necessary to conduct further investigation to adequately i <br /> T' '�determine the extent of contaminant migration. However, conducting this investigation k <br /> should not prohibit you from proceeding with the initial design phase of a remediation <br /> plan to address the contamination, as required by Order No. 90-702. This plan may be <br /> modified or expanded to address the full extent of contamination after the { <br /> investigation is completed. <br /> We note that there have been significant delays in the progress of this investigaticn. } <br /> Although we believe the time schedule included in the Cleanup and Abatement Order was <br /> achievable, we note that you have previously objected to this time schedule. <br /> Therefore, we request that, along with the proposed remedial �'+ion plan, you also <br /> submit a proposed time schedule for completing the. <br /> lUn Gild <br /> implementing the remedial action plan. P 9 gruur,;I water � ivestigat <br /> By 28 September 1990, please submit zn initial remedial actionlan a t <br /> further ground water investigation, and a time schedule for completion of these tasks. <br /> If you have any questions, please call Tom Peltier at (916) 361-5731. <br /> WILLIAM H. CROOKS <br /> Executive Officer <br /> cc: Ms. Laurie Cotulla, San Joaquin County Department of Public Health <br /> Services, Stockton <br /> ,; Mr. Pat Cullen, Brown and Caldwell Consultants, Sacramento <br />