My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012749
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
ARCHIVED REPORTS XR0012749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:28:57 PM
Creation date
5/17/2019 2:06:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012749
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tti <br /> I <br /> j. H. KLEINFELDER &ASSOC.IATES <br /> Rx File No. W-2005-1 <br /> •- November 14, 1985 <br /> Page 2 <br /> r_a <br /> i- <br /> 1 . <br /> 1 <br /> ' n <br /> SOIL AND GROUNDWATER REPORT <br /> GEIiWEKE FORD <br /> LODI, CALIFORNIA <br /> I. INTRODUCTION <br /> The following report summarizes the soil and groundwater investigation performed <br /> adjacent to the Geweke Ford used car lot at 18 South Cherokee Avenue in Lodi, <br /> California. Geweke Ford contracted J. H. Klei:a-felder & Associates to initiate a site <br /> investigaticn to assess whether gasoline related constiuents are present in the sail <br /> and/or ground water beneath a recently removed storage tank located at the site. On <br /> September 20, 1985, J. H. Kleinfelder & Associates completed one soil boring and <br /> Installed one ground water monitoring well under this contract. This report describes <br /> the work elements associated with the test boring and monitoring Y Q11 installation and <br /> presents the analytical results obtained to date. <br /> II. BACKGROUND <br /> The site, under investigation is located on South Cherokee Avenue in the City of <br /> �-. Lodi as shown on Plate I. ,'One 1,000 gallon underground tank, removed, was thought <br />
The URL can be used to link to this page
Your browser does not support the video tag.