Laserfiche WebLink
PES Environmental, h1Z <br /> Geweke PrOPCrtY <br /> April 30, 1991 <br /> PLge 6 <br /> SITE CONTROL MEASURES ivitie <br /> d will be <br /> The prS Project geologist, Ms.Gill,will bncludesge of on-site drilling near ct s walkways and in city <br /> responsible for site control. As the projectgeneral public. The <br /> ted to ensure the safety Of the <br /> streets, access to the btea fined ll be liby i ety tape,cones, barricades,or other suitable <br /> active work area will <br /> methods. <br /> Communication between field team members will consist of verbal communications. <br /> WORK PRACTICES <br /> - <br /> field work are as <br /> Safe work practices to be employed during the entire progress of 3 <br /> follows., ! <br /> assemble and check out all equipment for integrity and proper function prior to <br /> Set up, <br /> starting work activities. <br /> Do not use faulty or suspect equipment. <br /> Changs the suit,gloves, or other protective <br /> Use only new and intact protective clothing. <br /> clothing if torn. towels. <br /> r :ot +est hands to wipe sweat away from face. Use a clean towel or paper <br /> TraIfNING AND MEDICAL MONITORING <br /> All PES employees have fulfilled the applicable training and medical moshall nitoring <br /> mide <br /> req <br /> e uirements described in 40 CPR 1910.1247. is prior o performing oAji subcontractors to n-site work . <br /> evidence of having met the same requirernen <br /> prior to initiating field activities, a tailgate raining session shall be <br /> Also, immediately P <br /> held to discuss this HSP and the procedures contained he <br /> i <br /> i <br /> Jr <br /> 1\GE01BH01.W51 <br /> i <br />