My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012749
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
ARCHIVED REPORTS XR0012749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:28:57 PM
Creation date
5/17/2019 2:06:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012749
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PES Environmental, h1Z <br /> Geweke PrOPCrtY <br /> April 30, 1991 <br /> PLge 6 <br /> SITE CONTROL MEASURES ivitie <br /> d will be <br /> The prS Project geologist, Ms.Gill,will bncludesge of on-site drilling near ct s walkways and in city <br /> responsible for site control. As the projectgeneral public. The <br /> ted to ensure the safety Of the <br /> streets, access to the btea fined ll be liby i ety tape,cones, barricades,or other suitable <br /> active work area will <br /> methods. <br /> Communication between field team members will consist of verbal communications. <br /> WORK PRACTICES <br /> - <br /> field work are as <br /> Safe work practices to be employed during the entire progress of 3 <br /> follows., ! <br /> assemble and check out all equipment for integrity and proper function prior to <br /> Set up, <br /> starting work activities. <br /> Do not use faulty or suspect equipment. <br /> Changs the suit,gloves, or other protective <br /> Use only new and intact protective clothing. <br /> clothing if torn. towels. <br /> r :ot +est hands to wipe sweat away from face. Use a clean towel or paper <br /> TraIfNING AND MEDICAL MONITORING <br /> All PES employees have fulfilled the applicable training and medical moshall nitoring <br /> mide <br /> req <br /> e uirements described in 40 CPR 1910.1247. is prior o performing oAji subcontractors to n-site work . <br /> evidence of having met the same requirernen <br /> prior to initiating field activities, a tailgate raining session shall be <br /> Also, immediately P <br /> held to discuss this HSP and the procedures contained he <br /> i <br /> i <br /> Jr <br /> 1\GE01BH01.W51 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.