My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012749
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
ARCHIVED REPORTS XR0012749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:28:57 PM
Creation date
5/17/2019 2:06:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012749
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I_,t <br /> I <br /> 14 <br /> i <br /> Laboratory Analytical Quality Ass*rance <br /> In addition to routine calibration of the ins:miments with standards and blanks and <br /> preventive maintenance, the analyst is required to run spikes and duplicate spikes on 5) percent <br /> of the analyses to ensure an added measure of precision and accuracy. Accuracy is also verified <br /> through the following: <br /> L Certification by California Department of Health Services. <br /> 2. intralaboratory check samples from EPA,commercial sources,and the Internal Quality <br /> Control Officer. <br /> 3. Regular performance and system audits conducted by the laboratory director and <br /> Quality Control Officer, <br /> PROJECT SCHEDULE <br /> This section provides a schedule for completion of the work described in this work plan. <br /> The starting date of each phase of field work will depend on review and approval of this work <br /> plan and on driller av,ilability, <br /> Well Redevelopment and Sampling <br /> Well redevelopment should take I week to complete. Well sampling should take an <br /> additional week to complete, and laboratory analyses should take an additional 2 to 3 weeks <br /> beyond that. <br /> v I <br /> Monitoring Wells <br /> B,)mhole drilling,monitoring well installation,well development,and groundwater sampling <br /> will take approximately 2 weeks to complete, pending the property owners' permission to drill. <br /> Laboratory analyses will take an additional 2 to 3 weeks. <br /> Y' <br /> Problem Assessment Report <br /> After completion of all the tasks described in this work plan, a problem assessment report <br /> will be prepared. The report,will be issu-d approximately 4 to 5 weeks after all tasks have been <br /> completed <br />
The URL can be used to link to this page
Your browser does not support the video tag.