My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001595
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
ARCHIVED REPORTS XR0001595
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:54:58 PM
Creation date
5/17/2019 2:11:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001595
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On February 2, 1994, approximately 90 DOT drums containing soil cuttings and purge water <br /> were treated with a bacteria] inoculum The drums represented an accumulation of soil <br /> cuttings and purge water from monitoring well installations and samplings over the past few <br /> Iyears The lid for each drum was removed and the bactenal inoculum was placed directly <br /> onto the contents of each drum After inoculation was completed, each lid was replaced <br /> On .Tune 21, 1994, water samples were collected from five inoculated drums The samples <br /> were transported to a state-certified laboratory and composited for analysis No petroleum <br /> hydrocarbons were detected in the composite water sample from the treated drums <br /> On June 22, 1994, three soil samples were collected from drums containing soil cuttings The <br /> samples were transported to a state-certified laboratory and composited for analysis TPH <br /> as gasoline was detected in the composite soil sample at 3 1 ppm, no BTE&X were detected <br /> in the composite soil sample <br /> Results of the drum treatment provided encouraging results for the treatment of both <br /> hydrocarbon impacted sod and groundwater Based upon the results of the pilot study and <br /> the drum treatment, a full-scale soil inoculation was initiated in August 1994 <br /> 2.3 Full Scale Bioremediation Inoculation <br /> On August 16, 1994, full-scale inoculation of the site was initiated At that time, <br /> approximately 1,200 gallons of inoculum were introduced into wells on-site A total of nine <br /> monitoring wells, one extraction well and six remediation wells were inoculated <br /> Both soil and groundwater were inoculated during the full scale inoculation Packers were <br /> rused in several wells to allow the direction of inoculum into specific zones The packers used <br /> were non-pneumatic because a 100 percent seal was not necessary Details of the <br /> inoculation procedure were reported in the September 1994 Quarterly Report <br /> 2.4 Aquifer Testing <br />' Between July 13 and 15, 1994, a series of aquifer tests were performed at the site Two slug <br /> tests were performed on monitoring well MW-13, a step test was performed on well EW-1, <br /> and a pumping test was performed on well EW-1, with drawdown measured in surrounding <br /> t wells The procedures, results and conclusions of the aquifer testing were detailed in the <br /> September 1994 Quarterly Report <br /> 1 <br /> 30 PROCEDURES <br /> 3.1 Bioremediation Monitoring <br />' In accordance with the Proposed Revised Monitoring and Reporting Program No 94-701, <br /> G-1.9-1 A.6i SarvKes Inc `1 <br /> Qvanerly P po 02 4111 33 G2 <br /> EWQM6 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.