Laserfiche WebLink
' gasoline,BTE&X and volatile halocarbons Non-contaminated groundwater will then <br /> 8 � <br /> be discharged into the storm drain system <br /> • A work plan detailing the entire VES, air spargng and interim pumping will be <br />' submitted to the CVRWQCB one month prior to initiation of the contingency plan <br /> We hope that the concerns of the CVRWQCB have been adequately addressed If you <br />' require further information, please contact our office <br /> Sincerely, <br />' GEOLOGICAL AUDIT SERVICES, INC <br /> 1 <br />' Bob Marty <br /> Project Manager <br /> I <br /> I <br /> I <br /> 0 69"l An&U,I- <br /> 12 <br /> 1,33R7aw-6e.ltr,16-94 <br /> I <br />