Laserfiche WebLink
• <br /> QUARTERLY GROUNDWATER MONITORING REPORT <br /> MAY 1993 <br /> Bank of America/Security Pacific Property <br /> 300 S. state Street <br /> Ukiah, California <br /> 1. 0 INTRODUCTION <br /> In accordance with a request from Bank of America, personnel from <br /> Geological Audit Services, Inc. (GeoAudit) have performed quarterly <br /> groundwater monitoring procedures at 300 South State Street in <br /> Ukiah, California (the site) . The project background, procedures, <br /> findings and conclusions are presented in the following sections. <br /> The site location is presented in Figure 1. A plan of the site is <br /> presented in Figure 2 . <br /> 2 .0 BACKGROUND <br /> 2 .1 Site Assessment <br /> The site is located in a relatively flat commercial area of Ukiah <br /> (Figure 1) . Three 10, 000 gallon underground gasoline tanks were <br /> removed from the subject site in 1986. Hydrocarbon contamination in <br /> the soil and groundwater was discovered following the tank removal. <br /> Subsequent assessment activities included the installation of five <br /> on-site and four off-site groundwater monitoring wells (Figure 2) . <br /> A passive monitoring program was performed between the second <br /> quarter of 1990 and the first quarter of 1991. During the <br /> monitoring program, contamination levels showed considerable <br /> fluctuation. <br /> 2.2 Remediation <br /> Between August 1991 and August 1992 , active mitigation of soil <br /> contamination was performed. Soil in the vadose zone and capillary <br /> fringe was removed and bioremediated in an on-site remediation <br /> cell. A work plan and subsequent addendum for these activities were <br /> submitted to the Regional Water Quality Control Board - North Coast <br /> Region (RWQCB-NCR) on 31 May and 16 July 1991, respectively, and <br /> found adequate. To comply with current air quality regulations, a <br /> permit to bioremediate the contaminated soil was also secured from <br /> the Mendocino County - Air Pollution Control District (Permit No. <br /> A/C91-20) . <br /> Following completion of the bioremediation project, a report was <br /> submitted on 21 July 1992 to the RWQCB-NCR. <br /> 1 <br />