I <br /> 2.2 Additional Assessment <br /> GeoAudit submitted a work plan for the installation of additional soil bonngs and wells in <br /> GeoAu <br /> April 1993 The objective of this phase of investigation was to complete the assessment of <br />' the lateral and vertical extent of vadose zone contamination, and to install remedial wells <br /> One monitoring well, four remediation wells and two additional soil borings were installed <br /> during this phase of the investigation The results of the final investigation at the site were <br />' included in the amended FRP submitted by GeoAudit in July of 1993 The locations of all <br /> wells are illustrated in Figures 2 and 3 <br /> In accordance with the FRP, three additional remediation wells were also installed by <br /> GeoAudit in October of 1993 The results of the third quarter monitoring and the data <br /> obtained from the installation of remedial wells VW-5, VW-6, and VW-7, were presented <br /> in the September 1993 Quarterly Report <br /> 2.3 Quarterly Monitoring <br />' <br /> Between May 1990 and June 1993, several consulting firms, including Sun Tech <br /> y <br /> Environmental, Inc , performed quarterly groundwater monitoring at the site GeoAudit was <br /> retained in July of 1993 to continue quarterly monitoring at the site in accordance with the <br /> C & A order <br /> Ile The last quarterly monitoring was performed on December 27, 1993 Monitoring wells MW- <br /> 6, MW-7, MW-10, MW-11, MW-12, MW-13, MW-14 and EW-1 were sampled in accordance <br /> I <br /> with the C & A order <br /> Petroleum hydrocarbons were detected in samples from MW-7, MW-10, MW-11, MW-14 <br /> and EW-1 The concentrations of petroleum hydrocarbons decreased in MW-14 and EW-1 <br /> from the September 1993 sampling, however, concentrations in MW-7, MW-10 and MW-11 <br /> increased <br /> Volatile halogenated hydrocarbons(HVOC's,EPA 601),specifically 1,2-DCA,were detected <br /> in EW-1, MW-13 and MW-14 during the December 1993 sampling In each well, the <br /> I concentration of 1,2-DCA increased from the September monitoring Results of the <br /> December monitoring were reported in the Quarterly Report for December 1993 by <br /> GeoAudit <br /> I2.4 Blower Installation <br /> In December 1993, a low-pressure blower was installed at the site The blower was installed <br /> to provide a Iow pressure air source to the remediation wells in preparation for inoculation <br /> of the hydrocarbon-consuming bacteria The blower provides air to remediation wells VW-1 <br /> through VW-7 and monitoring wells MW-3, MW-4, MW-5 and MW-14 Initially, the blower <br /> was providing air to all the piped wells However, at the outset of the pilot test (see below), <br /> t 33/&94,GLDM QM4 <br />